Start 07.03.2011 Examination break 16.05.-06.06.2011 Building week 06.06.-12.06.2011
Georgia Institute of Technology
USA
Starting 09.02.2011 Building week 18-24.04.2011
End of project 29.04.2011
Indian Institute of Technology Bombay
India
Starting date 01.02.2011 Examination break 20.04.-02.05.2011 Building week 09.-15.05.2011
Nanyang Technological University
Singapore
Start 07.03.2011 Examination break 02.05.-22.05.2011 Building week 23.05.-29.05.2011
Shanghai Jiao Tong University
China
Start 23.02.2011 Building week 11.-17.04.2011
Logo University
Timeblog
1
2
3
4
IIT
Bombay, India
Our team consists of 15-16 civil Engineering students including 3 final year students, 3 pre-final year students and rest sophomores. We are taking this project as an additional learning project besides the regular academic commitments.
21
04
If you want to follow our project please check the team's website:

http://www.civil.iitb.ac.in/cea/towerofbabylon

or the facebook entry:

https://www.facebook.com/Nirmaan.IITB?ref=hnav
22
05
Few of the ideas discussed:

Powai Lake purification
Vertical agriculture
Low cost housing
Low cost, sustainable and catchy structure through Recycling

Idea we converged at working on:
There is a lot of assorted waste in our campus, just occupying space and of no much use to the Institute. We decided to use it along with local sustainable resources and bring the best out of waste. Tower of Babylon was needed for a paradigm shift of that era and on same lines recycling and sustainability is a need of today’s era. We aim at promoting this with our structure.
22
05
Team interaction
23
05
Team interaction
23
05
team picture
23
05
Team looking for waste material
23
05
team picture
23
05
looking at the possible building site
23
05
1
2
3
4
!!! Dieses Dokument stammt aus dem ETH Web-Archiv und wird nicht mehr gepflegt !!!